![]() |
![]() |
|||||||||||||||||||
![]() |
||||||||||||||||||||
| LINE PULLS | ||||||||||||||||||||
![]() |
||||||||||||||||||||
"Splashtron": Perfect Coating
For Pulling: |
||||||||||||||||||||
Horizontal drilled crossings have many advantages. Horizontal drilled crossings of pipelines - whether for rivers, beaches, or roads- have numerous advantages over their above-ground counterparts, from cost-saving to preserving the environment. Conventional dredge or bridge crossings are expensive to install and require continued maintenance. Trenchless construction, on the other hand:
|
||||||||||||||||||||
Pullback critical part of pipeline project. Once the river or road crossing is complete, the critical part of the project lies ahead - the pullback. Intermittent pulling and stopping to weld sections could cause the reamed whole to collapse or become partially obstructed, thereby forcing abandonment of the nearly-completed pipeline project. In addition, the pull can damage the integrity of the coating material; eventually the pipe itself. The quality of the coating material and its strength, flexibility, and corrosion protection are paramount to a successful drilled crossing. SplashtronŽ is the answer!
|
||||||||||||||||||||
P.O. Box 261 - Franklin,
Louisiana - 70538-0261 Toll Free: (800) 227-7394 | Local: (337) 828-4479 | Fax: (337) 828-7131 | Email: Sales@MarkTool.com Site Design by Jim Pierce's Computer Service |
||||||||||||||||||||